40 named things its latest annual report says its results depend on, each in the company's own words. 18 of them are also named by other companies we've read.

Customers

ConocoPhillips

earns from · 5 Mtpa of LNG
an affiliate of ConocoPhillips for a 20-year term for 5 Mtpa of LNG, as well as a natural gas supply management agreement whereby an affiliate of ConocoPhillips will manage the feed gas supply requirements for the PA LNG Phase 1 projectBusiness (Item 1)

Also named by CRGY, LB, PSX

Shell

earns from · 36% of the terminal’s capacity
The ECA Regas Facility generates revenues from fees under a firm storage and nitrogen injection service agreement with Shell that expires in May 2028 and permits it to use 36% of the terminal’s capacity, with the remaining capacity available for SI Partners’ use.Business (Item 1)

Also named by DINO

TotalEnergies SE

earns from · approximately 1.7 Mtpa of LNG
The ECA LNG Phase 1 project has definitive 20-year SPAs with an affiliate of TotalEnergies SE for approximately 1.7 Mtpa of LNG and with Mitsui & Co., Ltd. for approximately 0.8 Mtpa of LNG.Business (Item 1)

Cameron LNG tolling customers (TotalEnergies, Mitsubishi, Mitsui)

earns from · full nameplate capacity
The Cameron LNG Phase 1 facility has 20-year liquefaction and regasification tolling capacity agreements in place with affiliates of TotalEnergies SE, Mitsubishi Corporation and Mitsui & Co., Ltd., which collectively subscribe for the full nameplate capacity of the three trains at the facility.Business (Item 1)

Data centers

earns fromnamed as a risk
Data center development in Oncor’s service territory is expected to drive increasing electric demand and require a rapid and significant increase in Oncor’s grid infrastructure.Risk factors (Item 1A)

Also named by AESI, AGX, BKR, BSM, CBRE, CEG, CMI, CNP and 26 more

Comisión Federal de Electricidad (CFE)

earns fromnamed as a risk
SI Partners also faces risks related to doing business with PEMEX and the CFE, which are Mexican state-owned enterprises, including their financial solvency and performance of their respective contractual obligations.Risk factors (Item 1A)

Also named by ENB

PEMEX

earns fromnamed as a risk
The TDF pipeline system runs from PEMEX’s Burgos facility in the Mexican state of Tamaulipas, Mexico to SI Partners’ approximately 32,000-barrel LPG storage facility near the city of Monterrey, Mexico and is fully contracted to PEMEX on a firm basis through 2027.Business (Item 1)

Suppliers

Tangguh PSC

depends on · 500 MMcf of natural gas per day
SI Partners has an LNG SPA through 2029 with Tangguh PSC for the supply of the equivalent of 500 MMcf of natural gas per day at a price based on the SoCal Border index for natural gas.Business (Item 1)

Partners and platforms

ERCOT

operates in · approximately 90% of the electricity consumption in Texasnamed as a risk
A significant portion of Oncor’s five-year capital expenditures plan is attributable to addressing expected growth in ERCOT.Risk factors (Item 1A)

Also named by AEP, CEG, CNP, NRG, VLO, VST

Blackstone

49.9%named as a risk
If the CRNCI becomes redeemable, SI Partners may not have sufficient funds available to fulfill its obligation of redemption to satisfy Blackstone’s redemption right.Risk factors (Item 1A)

Also named by NI

Other companies

Aliso Canyon natural gas storage facility

concentrated in · 63% of SoCalGas’ working natural gas storage capacitynamed as a risk
A permanent closure, which could only be achieved through a new CPUC proceeding, could result in an impairment of the facility that could be material, and a closure or significant reduction in authorized capacity could risk energy and electric reliability in the region.Risk factors (Item 1A)

Also named by EIX

San Onofre Nuclear Generating Station (SONGS)

20% ownership interestnamed as a risk
SDG&E has a 20% ownership interest in SONGS, which we discuss in Note 15 of the Notes to Consolidated Financial Statements.Risk factors (Item 1A)

Also named by EIX

Oncor Electric Delivery

80.25% interestnamed as a risk
As a result of these measures, we do not control Oncor Holdings or Oncor, and we have limited ability to direct the management, policies and operations of Oncor Holdings and Oncor, including the deployment or disposition of their assets, declarations of dividends or other distributions, strategic planning, risk management, climate-related activities, cybersecurity practices and other important matters.Risk factors (Item 1A)

KKR Partners

$9.99 billionnamed as a risk
As we discuss in Note 6 of the Notes to Consolidated Financial Statements, in September 2025, we entered into an agreement to sell a 45% equity interest in SI Partners to the KKR Partners for $9.99 billion, subject to adjustments.Risk factors (Item 1A)

Port Arthur LNG project

approximately 13 Mtpanamed as a risk
for Sempra and SI Partners, the PA LNG Phase 1 project or PA LNG Phase 2 project experiencing higher construction costs, delays or other challengesRisk factors (Item 1A)

Gas Natural del Noroeste S.A. de C.V.

9.0 billion Mexican pesos (approximately $500 million U.S. dollar-equivalent at December 31, 2025)
In December 2025, we entered into an agreement to sell Ecogas, a natural gas regulated distribution utility that we describe below, to Gas Natural del Noroeste S.A. de C.V. for 9.0 billion Mexican pesos (approximately $500 million U.S. dollar-equivalent at December 31, 2025), subject to adjustments.Business (Item 1)

Guaymas-El Oro segment of the Sonora pipeline

named as a risk
timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems; stakeholder relations issues, such as the opposition by some members of the Yaqui tribe to the construction of the Guaymas-El Oro segment of the Sonora pipeline, which we discuss in in Note 1 of the Notes to Consolidated Financial Statements; work stoppages; unavailability or increased costs of materials, equipment, labor and commodities due to inflation, tariffs or supply chain or other issues; and a variety of other factors, many of which we discuss above under “Risks Related to All Sempra Businesses – Operational Risks” and elsewhere in this risk factorRisk factors (Item 1A)

Places

China

earns fromnamed as a risk
These recent tariffs, along with other U.S. trade actions, have triggered retaliatory actions by certain affected countries, including China’s announcement of a tariff on U.S. LNG.Risk factors (Item 1A)

Also named by A, AA, AAOI, AAP, AAPL, AB, ADI, AEHR and 261 more

City of San Diego

operates innamed as a risk
The City of San Diego is studying the feasibility of municipalization as a potential alternative to SDG&E’s existing electric franchise agreement, and various aspects of SDG&E’s natural gas and electric franchise agreements have also been challenged in a lawsuit that we discuss in Note 16 of the Notes to Consolidated Financial Statements.Risk factors (Item 1A)

Hazards

LA Fires (Palisades and Eaton fires)

approximately 16,200 structuresnamed as a risk
SoCalGas and Sempra are subject to pending litigation with respect to the operation of SoCalGas’ system and damage sustained as a result of the fires, which we discuss in Note 16 of the Notes to Consolidated Financial Statements.Risk factors (Item 1A)

California wildfires

concentrated innamed as a risk
Frequent and severe drought conditions, inconsistent and extreme swings in precipitation, changes in vegetation, unseasonably warm temperatures, low humidity, strong winds and other factors have increased the duration of the wildfire season and the intensity, prevalence and difficulty of preventing and containing wildfires in California, including in SDG&E’s and SoCalGas’ service territories.Risk factors (Item 1A)

Also named by AWK, C, CEG, IONS, RHI, SNPS, TRV

Texas wildfires

concentrated innamed as a risk
Additionally, in July 2025, S&P lowered Oncor’s senior secured debt and commercial paper ratings, citing elevated wildfire risk as a result of changing climate conditions and the lack of certain legal protections for wildfire litigation in Texas.Risk factors (Item 1A)

Commodities and inputs

Natural gas

exposed to its price · $11 millionnamed as a risk
A hypothetical 10% change in commodity prices would have resulted in a change in the fair value of our commodity-based natural gas and electricity derivatives of $11 million and $13 million at December 31, 2025 and 2024, respectively.Market risk (Item 7A)

Also named by AA, ADM, AEE, AEP, AES, AESI, AGX, ALB and 132 more

Mexican peso

exposed to its price · 124named as a risk
Our operations in Mexico pose foreign currency exchange rate and inflation risks.Risk factors (Item 1A)

Also named by AYI, AZO, BAX, CCK, CDRE, CP, DCH, EZPW and 14 more

Mexican inflation

exposed to its price · approximately $89 million lower earningsnamed as a risk
Based on a net monetary liability position of $4.5 billion, including those related to our equity method investments, at December 31, 2025, the hypothetical effect of a 10% increase in the Mexican inflation rate is approximately $89 million lower earnings attributable to common shares as a result of higher income tax expense for our consolidated entities, as well as lower equity earnings for our equity method investees.Market risk (Item 7A)

Baja California natural gas supply

depends onnamed as a risk
In addition, the Baja California region does not have extensive sources of natural gas, and at times, natural gas supply to the region is severely constrained and may impact our costs and our ability to source all feed gas required under our ECA LNG Phase 1 supply contracts.Risk factors (Item 1A)

Regulators

Federal Energy Regulatory Commission (FERC)

subject tonamed as a risk
In December 2024, the FERC issued an order, which SDG&E has appealed, finding that SDG&E is not eligible for the California ISO adder and that the TO5 adder refund provision had been triggered, requiring SDG&E to refund customers the California ISO adder retroactively from June 1, 2019.Risk factors (Item 1A)

Also named by AA, AEE, AEP, AM, AMRC, AR, ARES, ATO and 62 more

Public Utility Commission of Texas (PUCT)

subject tonamed as a risk
However, there is no assurance that the PUCT will judge all of the Texas utilities’ costs to have been prudently incurred and therefore fully recoverable.Business (Item 1)

Also named by AEP, CNP, CORZ, ETR, NEE, NRG, VST

California Public Utilities Commission (CPUC)

subject tonamed as a risk
The CPUC regulates SDG&E’s and SoCalGas’ customer rates and conditions of service, except for SDG&E’s interstate electric transmission and wholesale electric rates and conditions of service, which are regulated by the FERC.Risk factors (Item 1A)

Also named by EIX, ENPH, KMI, PAGP, VZ, ZM

U.S. Department of Energy (DOE) LNG export authorization

subject tonamed as a risk
In September 2025, we submitted a filing with the DOE to extend the construction deadline associated with our non-FTA permits for the ECA LNG Phase 1 project until the end of summer 2026, but we may not receive this extension on a timely basis or at all.Risk factors (Item 1A)

Laws and programs

California Wildfire Fund

subject to · in excess of $1 billionnamed as a risk
The 2019 Wildfire Legislation established the Wildfire Fund and the 2025 Wildfire Legislation established the Continuation Account, which offer liquidity to reimburse wildfire-related claims incurred by participating California electric IOUs in excess of $1 billion, subject to the coverage of each fund.Risk factors (Item 1A)

Also named by EIX

Community Choice Aggregation (CCA) and Direct Access (DA)

1,229,624named as a risk
Due to this departed load, SDG&E’s historical energy procurement commitments for future deliveries exceed the needs of its remaining bundled customers.Risk factors (Item 1A)

California RPS Program

subject to · at least 50% of its annual retail electricity delivered from renewable energy or zero-carbon sources by the end of 2026
SB 100 (enacted in 2018) and SB 1020 (enacted in 2022) require each California electric utility, including SDG&E, to procure at least 50% of its annual retail electricity delivered from renewable energy or zero-carbon sources by the end of 2026, 60% by the end of 2030, 90% by the end of 2035, 95% by the end of 2040, and 100% by the end of 2045.Business (Item 1)

U.S. tariffs on steel, aluminum and copper

subject tonamed as a risk
These threatened and imposed tariffs have created uncertainty in our business development efforts and for projects currently under construction, and we expect them to impact our businesses’ costs related to construction, pipeline transportation, electricity procurement and financing, among other areas, and increase costs across the LNG value chain.Risk factors (Item 1A)

Also named by CIEN, CSW, WHR

Net Energy Metering (NEM)

subject tonamed as a risk
As more and higher electric-use customers switch to NEM and self-generate energy, the burden on remaining non-NEM customers, who effectively subsidize the unpaid NEM costs, increases, which in turn encourages more self-generation and further increases rate pressure on remaining non-NEM customers.Risk factors (Item 1A)

Also named by EIX, HASI

Texas Unified Tracker Mechanism (UTM)

subject tonamed as a risk
However, the PUCT has not finalized rules with respect to use of the UTM, and as a result any positions Oncor has taken with respect to interpreting the legislation could be revised as a result of the PUCT’s final rules and interpretations, and such revisions could have a material adverse impact on our results of operations, financial condition, cash flows and/or prospects.Risk factors (Item 1A)

Mexico 2025 Energy Laws

subject tonamed as a risk
These laws and future implementation of existing and any new regulations could adversely affect SI Partners’ ability to secure favorable rate cases and operate its existing assets at their current levels; result in increased costs to SI Partners and its customers; adversely impact SI Partners’ ability to secure and retain permits and develop new projects in Mexico; result in decreased revenues and/or cash flows; and negatively impact SI Partners’ ability to recover the carrying values of its investments in Mexico, any of which could have a material adverse impact on our business, results of operations, financial condition, cash flow and/or prospects.Risk factors (Item 1A)

Gas Cost Incentive Mechanism (GCIM)

subject tonamed as a risk
However, SoCalGas may, at times, be exposed to market risk as a result of the GCIM, which awards or penalizes the utility for commodity costs below or above certain benchmarks.Market risk (Item 7A)

California natural gas reduction policies

subject tonamed as a risk
Moreover, a substantial reduction in or the elimination of natural gas use in California could result in impairment of some or all of SDG&E’s and SoCalGas’ natural gas infrastructure assets without adequate recovery of investments, if they were not permitted to be repurposed, or if they were required to be depreciated on an accelerated basis or were to become stranded, in which case, SDG&E and SoCalGas could be required to incur significant decommissioning or other costs, which may require additional funding and may not be recoverable in rates.Risk factors (Item 1A)

Vistra spin-off tax treatment

named as a risk
If it is ultimately determined that the Merger caused the spin-off not to qualify for the Intended Tax Treatment, Sempra, through its ownership of Sempra Texas Holdings Corp., could incur substantial tax liabilities, which would materially reduce the value associated with our investment in Oncor and could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.Risk factors (Item 1A)